MIKHAIL ANATOLYEVICH MARININ AND VALENTIN ALEXANDROVICH ISHEYSKY
Abstract
Deposits shall be performed according to the requirements of the normative-legal documents, regulations and scientifically grounded recommendations. The purpose of this work is to study the current status of the problem of mine engineering reclamation of disturbed lands during the development of steep-dipping ore fields by open-cut mining. The article considers the parameters of breach of a soil layer within the limits of the technical contour of the borrow cut, dumps, industrial sites and transport communications while developing the deposits by the open-cut mining; the necessary technology solutions were summarized and offered to perform the complex of reclamation works of the mine engineering stage taking into account the peculiarities of the open cut mining of the ore steep-dipping fields, requirements to the morphology of the established direction of reclamation and rapid return of the disturbed areas.